Customization: | Available |
---|---|
After-sales Service: | Long-Term |
Warranty: | 3-5 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
TECHNICAL DETAILS | ||||||
Dimensions | Width: 10 meters | Length: 20 meters | ||||
lnfrastructure - Concrete Beam | Width: 40 cm - Length: 50 cm | Concrete C30 | ||||
Infrastructure - Field Concrete | c20 feld concrete with 15 cm thick steel mesh | |||||
Water Drainage | The concrete floor is inclined 0.5% in one direction and the water is discharged from the surface. | |||||
Steel Construction | Double Corner Columns: 100 x 100 x 3 mm Beams: 100 x 80 x 3.5 mm Modular bolted system | Center Columns:100 x 80 x 3.5 mm Height: 3 - 4 m | ||||
Steel Mesh | Mesh Size: 50 mm * 50 mm | Wire Thickness: 4 mm | ||||
Steel Surface Coating | Electro Galvanized Coating | Electrostatic Powder Coating | ||||
Resistance | Maximum Wind Speed: 75 km/h | |||||
Glass | 10 mm Tempered Glass | |||||
Lighting | 8 Pieces 200 W LED Projector | |||||
Synthetic Grass | 11 - 13 mm FB - MFF _ TXT | |||||
Equipment | Padel Posts and Net | |||||
APPLICATION METHOD | ||||||
Concrete Beam | Plywood molds should be connected and the process should be done solidly. | |||||
Infrastructure | The existing ground should be well compacted and leveled. lt should be inclined in one direction | |||||
There should be no corrugation on the floor and the court must be concrete. | ||||||
Steel Construction | Welding and painting works must be done in the factory and the steel construction should bemounted on the ground with screws in the court. | |||||
Steel Mesh | lt is fixed to the columns with fasteners | |||||
Glass | lt is fixed to the steel construction with special glass fasteners. | |||||
Lighting | Lighting projectors are fixed by adjusting their angles and spacing to illuminate the entire court | |||||
Synthetic Grass | Synthetic grasses obtained from special PE raw materials, with high resistance UV additives andproduced in accordance with game performance, are combined in place with Joint Tape and PU Gluein accordance with the project. Lines are placed using the original self-colored white synthetic turf.Then, the feld is filled with sand filling material in accordance with international criteria and the finastage is started. After leveling and brushing, the game is ready to play. The synthetic turf system isproduced in accordance with the ball bounce criteria in padel games | |||||
Equipment | Padel poles and net are installed | |||||
COLOURS | ||||||
Steel Construction | Standard: Black | Optional: All Ral Codes | ||||
Steel Mesh | Standard: Black | Optional: All Ral Codes | ||||
Synthetic Grass | Synthetic Grass Carpet: Green, Blue Red | |||||
PACKAGING TYPES | ||||||
Steel Construction | lt is shipped on pallets that are produced in special sizes and bonded | |||||
Steel Mesh | lt is shipped on pallets that are produced in special sizes and bonded | |||||
Glass | lt is shipped on wooden pallets. | |||||
Lighting | lt is shipped in boxes of special sizes. | |||||
Synthetic Grass | lt is shipped in 2 and 4 meter length rolls. Joint tape comes in 1.4 m rolls | |||||
The glue comes in two-component buckets. | ||||||
Other | Various, Pallet, Sack and Free products | |||||
PRODUCT STORAGE CONDITIONS | ||||||
Adhesive and Derivative | Between +5 and +30 degrees | |||||
Other Materials | Between -10 and +40 degrees | |||||
PRODUCTION AND INSTALLATION PROCESS | ||||||
Infrastructure | Preparation: 2 days | Application: 5 days | Cannot Be Done Simultaneously | |||
Steel Construction | Production: 7-35 days | Installation: 2 days | Can Be Done Simultaneously | |||
Steel Mesh | Production: 7 -35days | Installation: 1 days | Can Be Done Simultaneously | |||
Glass | Spots | Installation: 1 days | Can Be Done Simultaneously | |||
Lighting | Spots | Installation: 1 days | Can Be Done Simultaneously | |||
Synthetic Grass | Spots | Installation: 2 days | Cannot Be Done Simultaneously | |||
Equipment | Spots | Installation: 1 days | Can Be Done Simultaneously | |||
GUARANTEE PERIODS | ||||||
Steel Construction | 5 Years | |||||
Paint | 5 Years | The paint on the surface should not be removed by external impacts | ||||
Steel Mesh | 3 Years | The paint on the surface should not be removed bv external impacts | ||||
Glass | 2 Years | it should not be damaged on corner points | ||||
Lighting | 2 Years | |||||
Synthetic Grass | 3 Years | |||||
Equipment | 2 Years |
1. who are we?
We are based in Guangdong, China, start from 2022,sell to Mid East(60.00%),Southeast Asia(20.00%),North America(10.00%),Eastern Europe(2.00%),South America(2.00%),Africa(1.00%),Northern Europe(1.00%). There are total about 1-4 people in our office.